Reconstruction project for the LitPol Link interconnector at Alytus District Municipality Alytus sub-municipal area Butrimiškės village
We have been commissioned by Litgrid AB to carry out the design work for the first phase of the LitPol Link extension. LitPol Link electricity interconnection is a strategic electricity project that has connected the electricity infrastructures of the Baltic States and Western Europe. As part of the LitPol Link Phase I extension project, the 400 kV AS was reconstructed to connect new 410/345/10 kV 600 MVA autotransformers. Two 330 kV overhead transmission lines are installed to connect autotransformers to the Alytus 330 kV switchyard. The capacity of the connector has been increased to 1700 MVA.
Key indicators:
Key indicators:
- Power transformer: 3x600 MVA;
- Rated voltage: 400/330 kV;
- Operative voltage: 220 VDC.
80+
Inžinierių komanda
800+
Klientų
8000 +
Atliktų projektų

Esame viena didžiausių projektavimo įmonių Lietuvoje, teikianti energetikos, pastatų bei infrastruktūros projektavimo paslaugas. Kartu su didele inžinierių komanda Lietuvoje ir Šiaurės Europoje įgyvendinome daugiau, kaip 8000 projektų, kurie prisidėjo ne tik prie siekio sujungti Europos Sąjungos šalių elektros sistemas su kontinentinės Europos tinklais bei tapti savarankiška Europos elektros sistemos dalimi, bet ir prie visuomenės kasdienės gyvenimo kokybės gerinimo kuriant šiuolaikišką infrastruktūrą, gyvenamąją aplinką bei mažinant energijos suvartojimą taip užtikrinant žalią ir gaivų rytojų ateities kartoms.