We have completed the reconstruction project of the 330 kV Vilnius substation commissioned by Litgrid AB. The reconstruction of the Vilnius substation was carried out due to the overhaul of the 330 kV overhead line Lithuania E-Vilnius from single-circuit to double-circuit. The aim of the project is to ensure reliable supply of electricity to the….
At the request of the Kaunas City Municipality Administration, we carried out a technical project for the arrangement of the Lampėdžiai beach area and overhaul of Gervių Stvreet. The aim of the project is to clean up Lampėdžiai beach by installing recreational infrastructure, repairing the street, installing a small roundabout, isolated and open parking lots…..
We have been commissioned by Litgrid AB to carry out the design work for the first phase of the LitPol Link extension. LitPol Link electricity interconnection is a strategic electricity project that has connected the electricity infrastructures of the Baltic States and Western Europe. As part of the LitPol Link Phase I extension project, the….
On behalf of Lithuanian Airports, we have carried out a simplified construction project for a car park with a viewing platform at Rodūnios road 2, Vilnius. The design of the aircraft observation deck is unparalleled in the territory of Vilnius Airport, located in the southern part of the airport, in the best runway opening area…..
We have been commissioned by the Public Enterprise Plačiajuostis internetas to carry out a project to install next-generation internet access infrastructure for communication towers. The aim of the project is to create preconditions for residents to connect to the next generation access network in areas not currently covered by the next generation access infrastructure (“white….
We have completed the detailed design for the construction of the 110 kV Biruliškės transformer substation for Litgrid AB. This is one of the first energy projects in Lithuania to be implemented in a BIM environment. A 110 kV transformer substation has been designed to transmit the electricity generated at the Kaunas CHP plant. The….
The project provides for the modernisation of the existing street lighting network in 8 areas of the Old Town of Vilnius by replacing the existing supports with new decorative supports and replacing the luminaires with modern led-type luminaires. The height and position of the lighting supports and the optimum choice of light sources are based….